2005 Road Projects
In 2005 the Columbia Township Board plans to continued to improve Columbia Township roads by
paving, graveling, ditching, and other work. See the
actual figures in the table below for details.
|
Project
Road Segment
|
Cost
|
|
24th West of 47th
Replace existing drainage structure
|
$10,681 |
| 49th from 18th North to low area Install
buried pipe to improve drainage |
$19,745 |
| 50th from Baseline South Clear right of way;
earth excavation |
$10,100 |
|
Sealcoat
24th from 52nd West to CR 215 54th from CR 388 North to Baseline 51st
from 8th South to Saddle Lake 46-1/2 from CR 384 South to 14th 47th from
CR 384 South to CR 380 24th from 47th West to 50th |
$51,012 |
|
CR 681 from CR 380 South to 24th |
$56,790 |
| CR 384 Crack Seal |
$2,347 |
| Boom Mowing - Miscellaneous
Roads |
$3,452 |
| Extra Paving Mix - Miscellaneous
Roads |
$500 |
|
Gravel - Miscellaneous Roads |
$31,323 |
|
Ditching - Miscellaneous Roads |
$2,894 |
|
Ditch Mowing - Miscellaneous Roads |
$2,000
|
| Driveway Culverts |
$3,594 |
| Bag Chloride |
$372 |
|
2005 Total |
194,810 |